Friday, March 26, 2010

Paint




The interior walls were painted this week.

Wednesday, March 24, 2010

Lighting

Well, we went and picked out the lighting for the house. It wasn't as hard as we thought it would be. It took us a little over an hour and we are really happy with the picks we made.


There will be one of these lights on each side of the garage door.


There will be one of these smaller outdoor lights by the back door from the garage and by the french doors in the back.

There are three sizes of this light. The larger, 3-light version will be in the bedrooms, master closet, and the entryway. The medium, 2-light version will be in the hallway, and a small, 1-light version will be in the master toilet room.



This light will be in the living room.

This is the vanity light for the master bathroom.

This light is the ceiling light for the master bath. It's a match for the vanity light.
This is the vanity light for the common bathroom.

Sunday, March 14, 2010

More Finish Work



This week the gutters were installed, the baseboard was finished, and the finish stair treads were put in. The garage door guy finally installed the correct door. Also, the prep for painting was started.

Yesterday the hardwood and tile was delivered.

Sunday, March 7, 2010

Soffits and Shelving



Two days ago the soffit guys got to work and did a good lookin job. Yesterday, we did some work on the inside. The baseboard was prepped and some of it was installed. The shelving was also done, which I got to do most of. It was the first time I have been able to work on our house in a long time.